Insulation Resistance Checker
Enter the circuit type (SELV/PELV, up to 500 V, above 500 V), test voltage and reading in MΩ to compare with the IEC 60364-6 and Korean minimum values.
Minimum insulation resistance — low-voltage circuits
| Circuit nominal voltage | DC test voltage | Insulation resistance |
|---|---|---|
| SELV and PELV (extra-low voltage: ≤ 50 V AC, ≤ 120 V DC) | 250 V | ≥ 0.5 MΩ |
| FELV, up to 500 V (e.g. 230 V, 400 V, 480 V) | 500 V | ≥ 1.0 MΩ |
| Above 500 V (up to 1000 V) | 1000 V | ≥ 1.0 MΩ |
Extra-low voltage (ELV) is up to 50 V AC or 120 V DC. SELV (unearthed) and PELV (earthed) circuits are separated from the primary; FELV is not. The values are for new installations (Korea: from 2021); for older installations, high voltage, or equipment-level tests, see the source text and the maker's data.
Reading the result
- Passing the minimum is not the whole story. A large drop from earlier readings of the same circuit under the same conditions can be the start of moisture, dust or insulation damage — log readings and watch the trend.
- If several circuits measured together read low, split them at breakers or terminal blocks and re-measure to narrow down the low section.
- Putting 500 V on SELV/PELV (24 V control) circuits can damage electronics left connected — use the specified 250 V.
To check signal and supply wiring with a multimeter, use the multimeter reading checker. To keep records, use the commissioning checklist maker.
FAQ
Do I test a 24 V control circuit at 500 V?
No. SELV and PELV (extra-low voltage) circuits are tested at the specified 250 V. 500 V can damage electronic parts left in the circuit; disconnect PLCs, drives, power supplies and similar equipment before testing.
Is a reading above the minimum always fine?
The minimum is only the pass line. If the value has dropped a lot compared with earlier readings taken the same way and at the same time (e.g. 1 minute), moisture, dust or insulation damage may be starting — log it and watch the trend.
Several circuits measured together read low
Split them at breakers or terminal blocks and measure again to narrow down the low section. Isolate, verify absence of voltage and lock out before testing, and discharge the cable afterwards before touching it.