Commissioning and maintenance checklist maker
Pick the job (new installation, routine inspection, expansion, replacement or removal) and what is on site (PC, PLC, HMI, drive, power meter, 4-20 mA, NPN/PNP sensors, RS-485, Ethernet switch, USB-serial, 24 V supply, remote access) and get a step-by-step checklist. Ticks and notes are kept in this browser; print or save as CSV.
How to use it
First pick the job. New installation runs from preparation to records and backup; routine inspection covers terminals, cables, fans, UPS, PC storage and communication error trends; expansion covers free addresses and IPs, unit loads, termination position, polling time and supply capacity; replacement covers recording the old device's settings, model and firmware, and carrying over address and termination; removal covers moving termination to the new end, taking the address out of the poll list, leftover wiring and freeing IPs and addresses.
Then pick the components on site and the matching checks appear in five stages (preparation, power off, powered, communication, records). Common checks are always included. Before and after an expansion or removal, «Compare changes» in the System diagram editor shows changed devices, termination, unit loads and polling time.
Each check links to related guides and web tools. Ticks and notes are saved in this browser, so you can keep it open on a phone on site and work down the list. When done, print it or save a CSV for the commissioning record.
The checks are a starting point built from general field practice. Equipment manuals, site safety rules and customer requirements always come first, and electrical work is done by a qualified person.
Use with: Wiring diagram maker · System diagram editor · Connector pinout reference
FAQ
Where are my ticks stored?
Only in this browser's localStorage. Nothing goes to a server, so they are not shared with other PCs or phones. Use Save CSV or Print to keep them.
Can this replace our company checklist?
If your company or site has an official checklist, that comes first. Use this one as a starting point for items that are easy to forget.
Do my ticks disappear when I switch the job?
No. Ticks and notes are kept separately for each job and come back when you pick that job again.
I want to add items.
Write them in the note fields, or save as CSV and add rows in a spreadsheet. If an item is commonly needed, tell us via «Leave feedback» below.