Picking up a workpiece with vacuum pads means deciding the pad size and count, the vacuum level, and the ejector (or vacuum pump) size. The first two come from force, the last from time. This guide follows the formulas and selection example in SMC's «Vacuum Equipment Model Selection» (PDFs on SMC's official site).

Lifting force = vacuum × pad area ÷ safety factor

W (N) = P (kPa) × S (cm²) × 0.1 × 1/t
  P  vacuum (magnitude: 60 for −60 kPa)
  S  pad area = π/4 × (diameter in cm)²
  t  safety factor — 4 or more horizontal, 8 or more vertical

ø40 pad (12.57 cm²), −60 kPa:
  theoretical force  60 × 12.57 × 0.1 = 75.4 N
  horizontal (÷ 4)   18.8 N   (about 1.9 kg)
  vertical (÷ 8)      9.4 N   (about 0.96 kg)

The 0.1 converts kPa × cm² to newtons (1 kPa × 1 cm² = 0.1 N). SMC calls pressure × area without a safety factor the «theoretical lifting force»; it is a static value, so SMC says to divide by a safety factor in practice.

PadArea cm²−40 kPa−60 kPa−80 kPa
ø100.793.1 N4.7 N6.3 N
ø203.1412.6 N18.8 N25.1 N
ø328.0432.2 N48.3 N64.3 N
ø4012.5750.3 N75.4 N100.5 N
ø5019.6378.5 N117.8 N157.1 N
ø8050.27201.1 N301.6 N402.1 N

The table is theoretical force with no safety factor. SMC's theoretical lifting force table truncates or rounds the last digit (e.g. ø40 at −60 kPa: 75 N), so the last digit differs slightly. Doubling the vacuum doubles the force; doubling the diameter quadruples it.

Safety factors 4 and 8 — why so large

Choosing a pad size — an example

A 5 kg plate (49.0 N), four pads, horizontal lifting, −60 kPa from an ejector (the value SMC gives as a guide for ejectors), safety factor 4:

Area per pad S = W × t ÷ (P × 0.1 × pads)
              = 49.0 × 4 ÷ (60 × 0.1 × 4) = 8.17 cm²
Diameter = √(4 × 8.17 ÷ π) × 10 = 32.3 mm  →  ø32 is short, use ø40

With 4 × ø40: lifting force 75.4 N (after ÷ 4) — −39 kPa would be enough
Gripping the same plate by its side (t = 8): 45.6 mm → ø50

SMC notes that unnecessarily high vacuum wears and cracks pads sooner, lengthens response time and costs more energy. If force is short, increase pad size or count before raising the vacuum.

SMC's selection example — a semiconductor chip

Chip 1 g = 0.0098 N, one ø4 pad (0.13 cm²), horizontal t = 4
0.0098 = P × 0.13 × 0.1 × 1/4   →   P = 3.0 kPa
→ −3.0 kPa or more holds it

Light workpieces can be held at very low vacuum. In that case it is response time, not force, that sizes the ejector.

Adsorption response time — pipe volume ÷ suction flow

Pipe volume    V (L) = π/4 × D (mm)² × L (m) ÷ 1000
Response time  T1 = V × 60 ÷ Q        (63 % of final vacuum)
               T2 = 3 × T1              (95 %)
Flow needed    Q = V × 60 ÷ T1 + QL      (QL leakage)
Ejector max. suction flow = (2–3) × Q
Ejector average suction flow Q1 = max × (1/2–1/3),  pipe max. flow Q2 = C × 55.5
Q = smaller of Q1 and Q2

SMC's example holds the chip through a 2 mm ID, 1 m tube. V = π/4 × 2² × 1 ÷ 1000 = 0.0031 L; for 300 ms, Q = 0.0031 × 60 ÷ 0.3 = 0.62 L/min, so an ejector with 1.24–1.86 L/min or more max. suction flow will do. The 5 L/min ejector actually chosen gives Q1 ≈ 1.7, and the tube's conductance 0.22 gives Q2 = 12.2, so with the smaller 1.7, T1 = 0.109 s (109 ms) — within 300 ms.

TubingVolume VEjector max. 20 L/min (Q1 6.7–10)T2 (95 %)
4 mm ID × 1 m0.0126 LT1 75–113 ms226–339 ms
4 mm ID × 2 m0.0251 LT1 151–226 ms452–679 ms
6 mm ID × 2 m0.0565 LT1 339–509 ms1.02–1.53 s

These assume the pipe conductance (Q2) is larger than Q1. With the same ejector, longer and larger tubing means more volume and a slower response — which is why ejectors are mounted close to the pads. If the workpiece leaks, add the leakage QL (= 55.5 × leak conductance) and size the ejector up.

In PortDock

Published 2026-10-24